Vue de la page 0
$7.50
CEMLINE CORPORATION
P. O. Box 55, Cheswick, PA, 15024
Phone: (724) 274-5430
FAX (724) 274-5448
www.cemline.com
Installation, Operation, and Maintenance Manual
CEMLINE CORPORATION
®
Electric Water Heaters (Series EHB & FTB)
and Electric Water & Steam Boilers
EHB Series Water Heaters
FTB SeriesWater Heaters
Water and Steam Boilers
Vue de la page 0
1 2 3 4 5 6 ... 67 68

Résumé du contenu

Page 1 - CEMLINE CORPORATION

$7.50 CEMLINE CORPORATION P. O. Box 55, Cheswick, PA, 15024 Phone: (724) 274-5430 • FAX (724) 274-5448 www.cemline.com Installation, Operation, an

Page 2 - Table of Contents

7 To order replacement parts, contact CEMLINE CORPORATION at the address listed above, or call toll free: USA Phone: (800) 245-6268 Note: P

Page 3

8 General Notes and Warnings Notes v This manual is intended to cover installation, operation, and maintenance procedures for CEMLINE CORPORATION E

Page 4 - Disclaimers

9 1. Turn off and lock out the electric power supply to the unit in an approved manner. 2. Turn off the cold water inlet and hot water outlet

Page 5 - General Information

10 3. all joints between low water cut off control, gauges, valves, etc. t Before attempting any installation, operation, or maintenance procedur

Page 6 - Construction

11 Product Features and Specifications Congratulations on purchasing a CEMLINE CORPORATION Electric Water Heater or Boiler. The unit purchased will

Page 7 - Electric Boilers

12 Installation Transporting and Unpacking the Unit Most CEMLINE CORPORATION Electric Water Heaters and Boilers Generators are crated, as necessary,

Page 8

13 In areas prone to seismic activity, it is recommended that the unit be mounted to the floor, according to recommended procedures for the site, to m

Page 9 - Contact Information

14 Note: Some Electric Steam Boilers are equipped with water feeder or pump. If so, the shutoff valve must be installed upstream from the water

Page 10

15 The CEMLINE Electric Water Heaters and Boilers have been completely wired during assembly. Connecting the electric power supply to the unit consis

Page 11 - General Notes and Warnings

16 Electric Steam Boilers For Electric Steam Boilers, the relief valve should be vented to atmosphere (generally through the roof). The piping used

Page 12 - Warnings

I Table of Contents Section Page Disclaimers ...

Page 13

17 Operation After all installation procedures have been completed, all power connections and cold water, hot water, and relief piping joints have be

Page 14

18 The auxiliary thermostat should be set ten degrees (10°) above the temperature at which the individual thermostats are set. Each unit is equippe

Page 15 - Installation

19 If all pilot lights are illuminated, the system has adequate water and is functioning within the high temperature limit. 8. After approximately

Page 16 - Hot / Boiler Water Outlet

20 that all pilot lights are illuminated. If any pilot light is not illuminated, it means that a problem exists that should be investigated. Daily O

Page 17

21 Parts List Replaceable Parts List The following is a list of parts that are generally replaceable, by trained / certified personnel, on CEMLINE C

Page 18

22 CEMLINE Electric Boilers Only Contactor Coils Gauge Glass High Pressure Cut Off (Automatic Reset - Steam Only) Hig

Page 19 - Completing Installation

23 Ordering Information All replacement parts for CEMLINE Electric Water Heaters and Boilers can be ordered directly from: CEMLINE CORPORATION

Page 20 - Operation

24 Inspection The following table summarizes the recommended time intervals for inspections of the Electric Water Heaters and Boilers, components, an

Page 21

25 Recommended Inspections Electric Boilers Only Time Interval To Be Inspected Per Manu. Specs. Daily Weekly Monthly Quarterly Semi- Annually

Page 22 - Shutdown Procedures

26 Troubleshooting The following table summarizes problems that may be encountered over the life of CEMLINE CORPORATION Electric Water Heaters and Bo

Page 23

II Maintenance - Electric Water Heaters and Boilers...29 Electric Power Connections - Rewir

Page 24 - Parts List

27 2. The thermostat(s) are not correctly sensing the water temperature. n Check the water temperature with a temperature gauge that is known to

Page 25 - Suggested Spare Parts

28 n Check and replace the water feeder or pump controller if found to be defective. (Reference the water feeder and pump controller replacement p

Page 26 - Ordering Information

29 Maintenance - Electric Water Heaters and Boilers The information contained in this section details service and maintenance procedures for the insp

Page 27 - Inspection

30 2. Unlock and open the door to the electric control cabinet. 3. After assuring the power has been turned off, disconnect and rewire the electric

Page 28

31 The auxiliary high temperature limit thermostat will also "trip" when the water temperature surpasses the temperature set on the thermost

Page 29 - Troubleshooting

32 in the compression fitting, as well as the temperature probe will come out of the tank with the compression fitting body. 8. Remove the body of t

Page 30

33 limit thermostat should be set ten degrees (10º) higher then the operating thermostats. 18. Refill the tank with water, examining the tank, compr

Page 31

34 Fuses - Inspection and Replacement 1. Turn off the power to the unit. t The combination of electricity and water can pose a very dangerous situ

Page 32

35 2. After assuring that the power is turned off and locked out, and the tank has been drained and given a chance to cool, unlock and open the door

Page 33

36 8. A new gasket has been supplied with the replacement heating element. Slide the new gasket over the heating element and align it with the face

Page 34

1 Disclaimers This Installation, Operation, and Maintenance Manual is intended to be as complete and up to date as possible. It covers the installat

Page 35

37 2. After assuring that the power is turned off and locked out, and the tank has been completely drained and given a chance to cool, unlock and op

Page 36 - Contactor - Replacement

38 Figure 2: Detailed Drawing of Typical FTB Type Heating Element Figure 3: Detailed Drawing of Typical FTB Type Heating Element Mounting

Page 37

39 10. Each rod is soldered to the element spacers. Unsolder and pull the rods out of the spacers. 11. Remove the compression fitting body. Note:

Page 38

40 Note: Bolts used to secure the FTB type heating element assembly in CEMLINE Electric Water Heaters and Boilers are rated as either Grade A or Grad

Page 39

41 Garlock Bolt Torque Values Grade 5 Bolts .062" Ring Gaskets ANSI - 300# Flanges Nominal Pipe Size (IN) Number of Bolts Size of Bolts (I

Page 40

42 26. After checking to make sure all tools / foreign matter has been removed from the electric control cabinet, and that all personnel are clear, t

Page 41

43 Float Type Low Water Cut Off Control - Replacement The float type low water cut off control assures that if the water level in the tank drops to a

Page 42

44 10. As the unit is filling and heating, inspect the joints at the low water cut off control (and any joints of other components that were loosened

Page 43

45 Pressure / Temperature Relief Valve Replacement If the pressure or pressure and temperature relief valve mounted on the tank is not functioning co

Page 44

46 2. After assuring that the power has been turned off and locked out, the pressure has been bled from the tank, the water has been drained, and th

Page 45

2 General Information This Installation, Operation, and Maintenance Manual is designed as a procedural guide for all CEMLINE CORPORATION Electric Wat

Page 46

47 On / Off Switch - Replacement If the on / off switch is determined to be defective and must be replaced, follow the procedures outlined below. 1.

Page 47

48 1. Turn off the power to the unit. t The combination of electricity and water can pose a very dangerous situation. Assure that all power has be

Page 48 - Pressure Gauge - Replacement

49 6. To install the new breaker, insert the side with the wire terminals in the receptacle first, and then push in on the opposite side until comple

Page 49

50 Maintenance - Electric Boilers Only The procedures contained in this section are for components that are only supplied with CEMLINE Electric Water

Page 50 - Pilot Light - Replacement

51 Gauge Glass - Replacement (Electric Steam Boilers Only) 1. Follow Steps 1 through 4 of the shutdown procedure (page 19) to take the unit off-line

Page 51

52 Resetting of the High Pressure Cut Off Switch (Manual Reset) If the pressure in the unit surpasses the limit set by the manual reset high pressure

Page 52

53 documentation, local codes, or accepted contractor practices as to the use and / or type of joint compound or sealer at the connections. 8. Tight

Page 53

54 2. Locate the box housing the solid state step controller mounted on the exterior of the boiler. Remove the cover. 3. If a specific board has b

Page 54

55 14. If no arcing is detected, the unit is ready for operation. Potentiometer - Replacement The potentiometer is mounted on the box that houses t

Page 55

56 11. If no arcing is detected, the unit is ready for operation. Solid State Step Controller Thermistor - Replacement The solid state step contro

Page 56

3 For Controls All CEMLINE Electric Water Heaters and Boilers use 120 volts for control operation. Whether 208, 240, 415, or 480 volts are utilized

Page 57

57 Note: Do not remove the compression fitting cap nut. This could allow the thermistor to become free and possibly fall into the tank. 7. Using t

Page 58 - Potentiometer - Replacement

58 Water Feeder or Pump Controller - Replacement (Electric Steam Boilers Only) The water feeder or pump controller is integrated into the piping on t

Page 59

59 9. If no leaks are found, follow the startup procedures (page 17) to put the unit back on-line.

Page 60

60 Appendix A Typical Wiring Diagrams Figure A-1: Typical Wiring Diagram For Electric Water Heaters

Page 61

61 Appendix A (cont'd) Figure A-2: Typical Wiring Diagram For Electric Water Boilers

Page 62

62 Appendix A (cont'd) Figure A-3: Typical Wiring Diagram For Electric Steam Boilers

Page 63 - Appendix A

63 Appendix B Bolt Torque Procedure SEQUENTIAL ORDER ROTATIONAL ORDER 1 - 2 1 3 - 4 5 5 - 6 3 7 - 8 7 2 6 4

Page 64 - Appendix A (cont'd)

64 Appendix B (cont'd) Bolt Torque Procedure SEQUENTIAL ORDER ROTATIONAL ORDER 1 - 2 1 3 - 4 9 5 - 6 5 7 - 8 13 9 - 10 3

Page 66 - Appendix B

4 Electric Water Heater and Boiler Jackets The jackets used for all CEMLINE Electric Water Heaters and Boilers are equipped with steel jackets that a

Page 67 - Appendix B (cont'd)

5 Other Components All other components, included in CEMLINE Electric Water Heaters and Boilers, have been specifically selected to meet the individu

Page 68

6 Advantages and Benefits of CEMLINE Electric Water Heaters and Boilers v STONESTEEL® tanks offer years of reliable, trouble free service.

Commentaires sur ces manuels